SFI SYSTEM > Cranking Holding Function Circuit |

| 1.READ VALUE USING INTELLIGENT TESTER (STARTER SIGNAL) |
Connect an intelligent tester to the DLC3.
Turn the ignition switch to ON.
Turn the tester on.
Enter the following menus: Powertrain / Engine and ECT / Data List / Starter Signal.
Check the result when the ignition switch is turned ON and the engine starts.
| Condition | Starter Signal |
| Ignition switch ON | OFF |
| Engine start | ON |
| Result | Proceed to |
| Outside standard range (for manual transaxle) | A |
| Outside standard range (for CVT) | B |
| Within standard range (for manual transaxle) | C |
| Within standard range (for CVT) | D |
|
| ||||
|
| ||||
|
| ||||
| A | |
| 2.INSPECT CLUTCH START SWITCH ASSEMBLY |
![]() |
Disconnect the clutch start switch assembly connector.
Measure the resistance according to the value(s) in the table below.
| Tester Connection | Switch Condition | Specified Condition |
| 1 - 2 | ON (pushed) | Below 1 Ω |
| 1 - 2 | OFF (free) | 10 kΩ or higher |
Reconnect the clutch start switch assembly connector.
|
| ||||
| OK | |
| 3.CHECK HARNESS AND CONNECTOR (POWER MANAGEMENT CONTROL ECU - CLUTCH START SWITCH ASSEMBLY) |
![]() |
Disconnect the power management control ECU connector.
Disconnect the clutch start switch assembly connector.
Measure the resistance according to the value(s) in the table below.
| Tester Connection | Condition | Specified Condition |
| D36-3 (STAR) - A29-2 | Always | Below 1 Ω |
| Tester Connection | Condition | Specified Condition |
| D36-3 (STAR) or A29-2 - Body ground | Always | 10 kΩ or higher |
| *1 | Front view of wire harness connector: (to Power Management Control ECU) |
| *2 | Front view of wire harness connector: (to Clutch Start Switch Assembly) |
Reconnect the power management control ECU connector.
Reconnect the clutch start switch assembly connector.
|
| ||||
| OK | |
| 4.CHECK HARNESS AND CONNECTOR (CLUTCH START SWITCH ASSEMBLY - ECM - ST RELAY) |
![]() |
Remove the ST relay from the engine room relay block.
Disconnect the ECM connector.
Disconnect the clutch start switch assembly connector.
Measure the resistance according to the value(s) in the table below.
| Tester Connection | Condition | Specified Condition |
| ST relay terminal 2 - A18-48 (STA) | Always | Below 1 Ω |
| ST relay terminal 2 - A29-1 | Always | Below 1 Ω |
| Tester Connection | Condition | Specified Condition |
| A18-48 (STA) or A29-1 - Body ground | Always | 10 kΩ or higher |
| *1 | Front view of wire harness connector: (to ST relay) |
| *2 | Front view of wire harness connector: (to ECM) |
| *3 | Front view of wire harness connector: (to Clutch Start Switch Assembly) |
Reinstall the ST relay connector.
Reconnect the ECM connector.
Reconnect the clutch start switch assembly connector.
|
| ||||
| OK | ||
| ||
| 5.INSPECT PARK/NEUTRAL POSITION SWITCH ASSEMBLY |
![]() |
Disconnect the park/neutral position switch connector.
Measure the resistance according to the value(s) in the table below.
| Tester Connection | Switch Condition | Specified Condition |
| 4 - 5 | Shift position P, N | Below 1 Ω |
| 4 - 5 | Shift position not P, N | 10 kΩ or higher |
| *1 | Component without harness connected: (Park/Neutral Position Switch) |
Reconnect the park/neutral position switch connector.
|
| ||||
| OK | |
| 6.CHECK HARNESS AND CONNECTOR (POWER MANAGEMENT CONTROL ECU - PARK/NEUTRAL POSITION SWITCH) |
![]() |
Disconnect the power management control ECU connector.
Disconnect the park/neutral position switch connector.
Measure the resistance according to the value(s) in the table below.
| Tester Connection | Condition | Specified Condition |
| D36-3 (STAR) - B13-4 | Always | Below 1 Ω |
| Tester Connection | Condition | Specified Condition |
| D36-3 (STAR) or B13-4 - Body ground | Always | 10 kΩ or higher |
| *1 | Front view of wire harness connector: (to Power Management Control ECU) |
| *2 | Front view of wire harness connector: (to Park/Neutral Position Switch) |
Reconnect the power management control ECU connector.
Reconnect the park/neutral position switch connector.
|
| ||||
| OK | |
| 7.CHECK HARNESS AND CONNECTOR (PARK/NEUTRAL POSITION SWITCH ASSEMBLY - ECM - ST RELAY) |
![]() |
Remove the ST relay from the engine room relay block.
Disconnect the ECM connector.
Disconnect the park/neutral position switch connector.
Measure the resistance according to the value(s) in the table below.
| Tester Connection | Condition | Specified Condition |
| ST relay terminal 2 - A18-48 (STA) | Always | Below 1 Ω |
| ST relay terminal 2 - B13-5 | Always | Below 1 Ω |
| Tester Connection | Condition | Specified Condition |
| A18-48 (STA) or B13-5 - Body ground | Always | 10 kΩ or higher |
| *1 | Front view of wire harness connector: (to ST relay) |
| *2 | Front view of wire harness connector: (to ECM) |
| *3 | Front view of wire harness connector: (to Park/Neutral Position Switch) |
Install the ST relay.
Reconnect the ECM connector.
Reconnect the park/neutral position switch connector.
|
| ||||
| OK | ||
| ||
| 8.CHECK HARNESS OR CONNECTOR (CLUTCH START SWITCH ASSEMBLY - ECM - ST RELAY) |
![]() |
Remove the ST relay from the engine room relay block.
Disconnect the ECM connector.
Disconnect the clutch start switch assembly connector.
Measure the resistance according to the value(s) in the table below.
| Tester Connection | Condition | Specified Condition |
| ST relay terminal 2 - A18-48 (STA) | Always | Below 1 Ω |
| ST relay terminal 2 - A29-1 | Always | Below 1 Ω |
| Tester Connection | Condition | Specified Condition |
| A18-48 (STA) or A29-1 - Body ground | Always | 10 kΩ or higher |
| *1 | Front view of wire harness connector: (to ST relay) |
| *2 | Front view of wire harness connector: (to ECM) |
| *3 | Front view of wire harness connector: (to Clutch Start Switch Assembly) |
Reinstall the ST relay.
Reconnect the clutch start switch assembly connector.
Reconnect the ECM connector.
|
| ||||
| A | ||
| ||
| 9.CHECK HARNESS AND CONNECTOR (PARK/NEUTRAL POSITION SWITCH ASSEMBLY - ECM - ST RELAY) |
![]() |
Remove the ST relay from the engine room relay block.
Disconnect the ECM connector.
Disconnect the park/neutral position switch assembly connector.
Measure the resistance according to the value(s) in the table below.
| Tester Connection | Condition | Specified Condition |
| ST relay terminal 2 - A18-48 (STA) | Always | Below 1 Ω |
| ST relay terminal 2 - B13-5 | Always | Below 1 Ω |
| Tester Connection | Condition | Specified Condition |
| A18-48 (STA) or B13-5 - Body ground | Always | 10 kΩ or higher |
| *1 | Front view of wire harness connector: (to ST Relay) |
| *2 | Front view of wire harness connector: (to ECM) |
| *3 | Front view of wire harness connector: (to Park/Neutral Position Switch Assembly) |
Install the ST relay.
Reconnect the ECM connector.
Reconnect the park/neutral position connector.
|
| ||||
| OK | |
| 10.INSPECT BATTERY |
Check that the battery is not depleted.
|
| ||||
| OK | |
| 11.CHECK BATTERY TERMINAL |
Check that the battery terminals are not loose or corroded.
|
| ||||
| OK | ||
| ||